PHOENIX BOULEVARD STREETSCAPE

Phoenix Blvd

The CIDs have identified enhancements to Phoenix Boulevard in the Master Plan including the repaving of all four lanes, constructing sidewalks on both sides of the road, building MARTA bus stop shelters, and installing both pedestrian and roadway lighting. Concepts and design is anticipated to begin in 2018.

Spring 2018 Progress Update
Contracted Metrocorp Development Enterprises to design bus shelter and infrastructure

Summer 2018 Progress Update
Resurfacing to begin July/August (Click here to download an informational flyer about the project)
Begin shelter construction after paving is complete

 